New Build NHS Healthcare Clinic in West London
Problem
The healthcare clinic faced several challenges related to mobile connectivity:
Ongoing Construction: The clinic was still under construction, which created difficulties in planning and implementing a mobile signal solution amidst ongoing building activities.
Lack of Initial Planning: Mobile signal enhancement had not been factored into the building’s initial design, requiring retroactive solutions that could be seamlessly integrated into the nearly completed structure.
Medical Equipment Interference: The installation needed to account for sensitive medical equipment, ensuring that the signal enhancement did not interfere with the clinic’s operational systems.
Signal Drop Zones: The four-storey building had multiple corners and potential dead zones where signal strength could drop, leading to unreliable communication, particularly in critical areas like consultation rooms and patient care areas.
Solution
A bespoke mobile signal enhancement system was designed and implemented to address the clinic’s unique challenges. The solution included:
Strategic Installation: High-gain signal boosters were strategically placed to cover all four floors of the building, ensuring that even the most remote corners received strong mobile signals.
Non-Disruptive Work: Installation was carefully scheduled to align with the construction timeline, minimising any disruption to the ongoing work and ensuring a seamless integration with the building’s infrastructure.
Interference Avoidance: Special consideration was given to the placement of equipment to ensure that it did not interfere with the clinic’s sensitive medical devices.
Results
Enhanced Mobile Connectivity: The installation successfully eliminated dead zones, providing consistent and reliable mobile coverage throughout the entire clinic.
Operational Efficiency: Reliable mobile signals support both staff communication and patient care, improving overall operational efficiency
Seamless Integration: The mobile signal enhancement system was integrated without disrupting the construction process or the functionality of medical equipment, ensuring that the clinic was fully operational from the moment it opened its doors.
Conclusion: The successful implementation of the mobile signal enhancement system at the private healthcare clinic in West London ensured that the building was equipped with reliable connectivity, crucial for both patient care and operational efficiency. By working closely with the construction team and carefully planning around sensitive medical equipment, the project was completed without compromising the clinic’s functionality or aesthetic appeal. The clinic now benefits from uninterrupted mobile communication across all floors, contributing to a more efficient and patient-friendly environment.
Transform Your Connectivity
Don’t let poor mobile signal hinder your business operations.
Get in touch for a free site survey.